Monday, November 16, 2009
Some electrical stuff

The wires are routed in the ICCF using an inexpensive electric chainsaw. The box is cut out using a drywall jab saw. In this case, the position that I really wanted for the triple box was right where there was some additional concrete (on the right-hand side). It took a few minutes with my little air hammer to get it to fit correctly.
The box is then foamed into place.