Monday, November 03, 2008

 

Backfill begins

First, the part that will be underground is parged with a cementicious mix.

Then, Delta dimple water shield is placed against the wall and held in place temporarily with nails.
Some leftover Form-a-Drain is placed vertically. This will cause any water to drop to the footing drain. Finally, it's backfilled with the ICCF scrap which is light, water permiable, non-degradable, and free.



Comments: Post a Comment

<< Home

This page is powered by Blogger. Isn't yours?