Wednesday, August 27, 2008
The Pour


Well, that's it. 13 yards of concrete in about 3 hours. I only took two pictures. I don't know if anybody else took any pictures.
It looks the same as before there was concrete in the forms.
The moisture seeping out is partly the heavy rain from the night before and partly the excess water from the concrete. I also hosed off the top blocks because I will be stacking another layer and didn't want rough concrete between the two layers of blocks. Hope those beam pockets are in the right place.