Sunday, August 24, 2008
Details

Both openings were then bucked out with 1/4" masonite flexed at the top. The plywood template was then placed back under the masonite to hold it in place. Cleats were attached to the door jambs to hold the plywood tight, and the whole thing was tacked in place with construction foam. Because of the roof slope, there's not much concrete above these arches.
