Monday, June 09, 2008

 

Block placement 3

Once the preliminary allignment was done, the track was screwed down.
Fine tuning was done using the strings from the batter boards.
I bought several hundred composite window shims which can be inserted inside of the track to align the level of the blocks. We used 3 shims. Oh well, I have some left over for the rest of the stacking and the house windows.
Posted by Picasa

Comments: Post a Comment

<< Home

This page is powered by Blogger. Isn't yours?