Once the preliminary allignment was done, the track was screwed down.
Fine tuning was done using the strings from the batter boards.
I bought several hundred composite window shims which can be inserted inside of the track to align the level of the blocks. We used 3 shims. Oh well, I have some left over for the rest of the stacking and the house windows.
Fine tuning was done using the strings from the batter boards.
I bought several hundred composite window shims which can be inserted inside of the track to align the level of the blocks. We used 3 shims. Oh well, I have some left over for the rest of the stacking and the house windows.