Block placement
Here's a box of the fabricated pieces.
I used a 16d nail to punch two holes in each side for using drywall screws to attach to the form boards.
The block is first placed on wood supports (a little thicker than the CFS track that we're using.)
Then the CFS track is inserted at the "nodes". The placement insures that they supports won't interfere with the later placement of the vertical rebar that has to come up through the block.
I used a 16d nail to punch two holes in each side for using drywall screws to attach to the form boards.
The block is first placed on wood supports (a little thicker than the CFS track that we're using.)
Then the CFS track is inserted at the "nodes". The placement insures that they supports won't interfere with the later placement of the vertical rebar that has to come up through the block.